The bulk excavation at Crimscott Street, located in the heart of Southwark, London, involves the systematic removal of material to prepare the site for substructure works. Surrounded by mixed-use developments and tight urban constraints, the dig requires precise coordination and traffic management to ensure minimal disruption.







